Artemis III RS-25 Engine Processing: #3 Lift
Technicians prepare to transfer the #2 RS-25 SLS (Space Launch System) rocket engine (front) to the work stand with the #3 engine (back) for integration with the Artemis III core stage rocket on Tuesday, Aug. 25, 2026, inside the Vehicle Assembly Building at NASA’s Kennedy Space Center in Florida. During Artemis III, the four RS‑25 engines will launch the Orion spacecraft and its crew of four into low Earth orbit, generating more than two million pounds of thrust at liftoff.
The text is NASA’s caption.
From NASA’s Image of the Day. NASA’s own photos are generally not protected by copyright; each one keeps NASA’s credit line, and pictures credited to anyone else are left out. NASA does not endorse this site. nasa.gov ↗
Rational