INDEPENDENT THINKING.
SHARED UNDERSTANDING.International edition · Correspondents across India and around the world
RationalTimes●
A little less noise.
A little more perspective.
Join our media house
BREAKING
VerifiedRex Ryan Arrested In Nashville Over Pedestrian Incident VerifiedDelhi Boy Falls Into Sewer, Dismembered Body Found In Water Treatment Plant VerifiedDylan Sprouse, Barbie Ferreira & Tanner Buchanan Lead Hamptons Thriller ‘The Sleeping Dogs Of Southampton’ — AFM VerifiedSS 2025-26: GVMC bags top rank ‘Swachh Shehar’ category VerifiedSaudi Arabia intercepts Houthi missiles, drones; group denies targeting Mecca ClimateCOP31 climate talks open in Antalya, Türkiye, on 9 November USAmericans vote in the midterm elections on 3 November TechnologyNorth Korea-linked hackers steal about $6.4 billion from Binance in the biggest crypto theft on record, analysts say WorldSpain mourns after a high-speed train ploughs into a stationary train near Toledo, killing at least 68 WorldIsrael’s election ends without a clear winner as exit polls leave both blocs short of a majority WorldSaudi Arabia intercepts Houthi missiles and drones as Egypt’s parliament backs military support PoliticsLula wins Brazil’s presidential runoff as Flávio Bolsonaro concedes
Verified · 2 outletsIndia

Minister Khandre Directs Officials To Blacklist L&T Over Project Delays

Headline via Deccan Chronicle · first report 11 Nov, 23:34 IST, latest 12 Nov, 01:19 IST

India Gate, New Delhi
Representational image · India Gate, New Delhi · Madrishh / Wikimedia Commons, CC BY-SA 4.0

What we know

2 independent news organisations have reported this story. The first report we saw came from Deccan Chronicle at 11 Nov, 23:34 IST; the latest is from The Hindu at 12 Nov, 01:19 IST. Rational Times has not independently confirmed the details: read each report through the links below.

StatusVerified
Reported by2 news organisations
First report11 Nov, 23:34 IST
Latest report12 Nov, 01:19 IST
DeskIndia

What the reports sayEach newsroom’s own summary of its report, from its feed

Officials said that L&T had failed to make headway even after being served a final notice.
Rural Development and Panchayat Raj Minister Eshwar Khandre has directed that Larsen & Toubro Limited be blacklisted for alleged slow progress of work in drinking water projects

Quoted from the newsrooms’ own feeds, with their names and links. Rational Times has not independently confirmed the details.

The reports2 reports

Headlines belong to the news organisations named; each links to their own report. We group reports automatically by their key words, so now and then two different stories can be grouped together, or one story split in two. Tell us about a mistake

Read nextThe biggest stories right now