EKH admin bars overloaded vehicles from Umiam bridge
Headline via The Shillong Times · first report 17 Nov, 06:00 IST, latest 17 Nov, 12:47 IST
What we know
2 independent news organisations have reported this story. The first report we saw came from The Shillong Times at 17 Nov, 06:00 IST; the latest is from Northeast Now at 17 Nov, 12:47 IST. Rational Times has not independently confirmed the details: read each report through the links below.
What the reports sayEach newsroom’s own summary of its report, from its feed
SHILLONG, Nov 16: In a move to safeguard the structural integrity of the newly constructed Umiam Bridge, the East Khasi Hills District Administration has prohibited the movement of overloaded goods-carrying vehicles exceeding the permissible gross vehicle…
Guwahati: The East Khasi Hills district administration has prohibited overloaded goods-carrying vehicles exceeding the permissible gross vehicle weight limit of 28.5 metric tonnes from plying on routes leading towards Shillong and the newly constructed Umiam…
Quoted from the newsrooms’ own feeds, with their names and links. Rational Times has not independently confirmed the details.
The reports2 reports
- The Shillong Times EKH admin bars overloaded vehicles from Umiam bridge
- Northeast Now Meghalaya: Overloaded vehicles above 28.5-tonne limit barred from Umiam bridge
Headlines belong to the news organisations named; each links to their own report. We group reports automatically by their key words, so now and then two different stories can be grouped together, or one story split in two. Tell us about a mistake
Rational






